• LAUNCH OF THE CONSTRUCTION OF GATUNDU-MUKINYE-JUJA ROAD
    LAUNCH OF THE CONSTRUCTION OF GATUNDU-MUKINYE-JUJA ROAD
  • PS INSPECTING THE ON GOING CONTRACTION WORKS OF THE MACKENZIE-MURUKA ROAD IN MURANGA COUNTY
    PS INSPECTING THE ON GOING CONTRACTION WORKS OF THE MACKENZIE-MURUKA ROAD IN MURANGA COUNTY
  •  THE NAIROBI EXPRESS PROJECT LOCATED ALONG THE EXISTING A8  NATIONAL HIGHWAY
    THE NAIROBI EXPRESS PROJECT LOCATED ALONG THE EXISTING A8 NATIONAL HIGHWAY
  • .
    .

The Brief Of Project

The Nairobi Expressway Project ids located along the existing A8 national highway,starting from the east side of Mlolongo and ending at james Gichuru Road.with a total length of 27.131km,of which the first 15.710km of the main line is mainly roadbed and the secound 11.421km is mainly bridges.Except for the two-way six-lane roadbed with standard width of 21.6m wide(Class A national road with designed speed of 80km/h)

According to different geological conditions, the bridge foundation sddopts enlarged foundation and pile foundation ,the lower structure adopts single-colum,double-pillar and portal pier,and the upper structure adopts prefabricated box girder and cast-in-place box girder.

THE MEANING OF PROJECT

The comletion of this project will become an expressway from Nairobi downtown to kenyatta international Airport and Mombasa.At the same time,it will divert urban traffic,reduce traffic congestion.and greatly reduce the current traffic congestion and motor vehicle cost And this project provides alot of job opportunities to the local area ,and it can boost the development of Kenyan infrastructure and promote the development of the local economy.

Quick Links

Copyright © 2025 Ministry of Transport,Infrastructure, Housing Urban Development and Public Works. All Rights Reserved.
Joomla! is Free Software released under the GNU General Public License.